In this course you will learn how to prepare and perform a downtime- optimized conversion (SAP ECC system to SAP S/4HANA system), from a system administrator point of view. Course based on software release:SAP S/4HANA 2022, SUM 2.0 SP 16.
  • ADM329
  • Dĺžka 2 dni
  • 0 ITK bodov
  • 1 termín
  • SR (na vyžiadanie)

    ČR (26 450 Kč)

In this course you will learn how to prepare and perform a downtime- optimized conversion (SAP ECC system to SAP S/4HANA system), from a system administrator point of view. Course based on software release:SAP S/4HANA 2022, SUM 2.0 SP 16.

»
  • System Administrator
  • Technology Consultant

This course will prepare you to:

  • Find the SAP Note on restrictions and issues 
  • Explain the prerequisites and the required preparation steps 
  • List the relevant phases and their activities 
  • Start a downtime-optimized Conversion run 
  • Monitor the replication process 
  • Explain the two process types for replication (R3load, ABAP batch)
  • Check database triggers 
  • Explain the role of SHD and TMP instances 
  • Explain the process to apply "Shadow Notes" 
  • Reconfigure the temporary system to add resources 
  • Create a customer buffer with FI customizing 
  • Select appropriate tables for uptime migration ("downtime-optimized DMO")

Recommended

  • ADM328
  • Experience with the Software Update Manager (SUM)

Príručka ku kurzu firmy SAP podľa programu kurzu.

  • Get the overview on the approach
  • Understand the concept of downtime-optimized Conversion
  • Find the SAP Note on prerequisites, restrictions, and issues 
  • Prepare and start a downtime-optimized Conversion run
  • Enable the approach
  • Create a customer buffer with FI customizing
  • Prepare Impact Analysis
  • Determine the tables for uptime processing
  • Choose the approach in the UI 
  • Executing approach specific activities
  • Examine the main blocks and phase names
  • Check database triggers
  • Understand restrictions / Freeze Triggers
  • Explain the role of SHD and TMP instances 
  • Explain the process to apply "Shadow Notes" 
  • Reconfigure the temporary system to add resources  
  • Adapt customizing on TMP
  • Monitor the replication process 
  • Understand the two process types for replication 
  • Understand project specific requirements
  • Consider Load verification
  • Plan Project cycles
  • Understand technical architecture
  • System setup is not typical, so timings and potential issues shall not be taken as typical
  • The goal of this course is the preparing and performing of a downtime optimized conversion of an SAP S/4HANA conversion of an SAP ECC system from a system administrator point of view. In addition, relevant aspects for project and test cycle planning are discussed.
  • The training class uses SAP S/4HANA 2022 as target product version, but the content of the class is applicable for conversions to SAP S/4HANA 2020 and above.
  • The following are not covered in this course:
    • A complete downtime-optimized Conversion run.
Aktuálna ponuka
Školiace miesto
Jazyk kurzu

Uvedené ceny sú bez DPH.

Školenie na mieru

Nenašli ste vhodný termín, alebo chcete školenie prispôsobiť špecifickým potrebám vášho tímu? Radi pre vás pripravíme školenie na mieru.